Welcome to St. Mary’s Kenilworth Square

About the Project

St. Mary’s College CSSp opened in Rathmines in 1890 and now comprises a boys’ primary school of 300 boys and a secondary of almost 500. The schools are under the patronage of the Spiritan Education Trust. Kenilworth Square was bought by the Spiritan Congregation for St. Mary’s sports’ grounds on 21st November 1947.

St. Mary’s College wishes to invest in the sports facilities and tree conservation in Kenilworth, and to make the facility available for use by community-based sports clubs.

In 2020, the College converted the 70m x 50m pitch in front of the school in Rathmines into an all-weather floodlit facility. It has been a notable success in improving the sports infrastructure in Rathmines and is used by a range of clubs for GAA, soccer and rugby, which had not been possible on the less-durable grass surface and without the lighting. The aim is to replicate this success in the school sports grounds in Kenilworth Square.

The College is very conscious of community interest in the proposal from people who live on the Square and its surrounds for whom the Square is part of their neighbourhood, and also from those affected by the shortage of all-weather playing surfaces in the locality. The aim is to replicate this success in the school sports grounds in Kenilworth Square and permit the similar users set out below that currently use St Marys School in Rathmines.

  • St Mary’s Senior School – school hours and up to 5.30pm.
  • St Mary’s Junior School – week days school hours and Saturday mornings.
  • Templeogue/Synge Street GAA Club (boys and girls).
  • Beechwood Soccer Club (boys and girls).
  • Ranelagh Gaels GAA Club (boys and girls).
  • Terenure Park Rangers (boys and girls)
  • Portobello GAA Club (boys and girls).
  • St Mary’s Rugby Club (RFC) (boys and girls).

The school will invite all of the above users to continue the relationship with the school and also to avail of the facilities in Kenilworth Square if required. In addition, the school will make the facilities available to other sports clubs where there is a significant shortage of playing fields, particularly during the winter months as was the case in 2023/2024.

The development costs are funded by donors, not investors. When other sports clubs use the grounds, they will make a contribution to cover the extra costs of opening and maintenance of the all-weather pitch. This is a non-profit making project. St Mary’s is a school, not a business.  And in addition, there will be no cost to the taxpayer in making this facility available to clubs in the community.

The following proposals are being published for feedback from residents of the area and other interested parties, before a formal planning application is made.

  1. To convert the three existing pitches, which are irregular in size and shape, into two full-sized rectangular pitches.
  2. To remove the existing pavilion at the south end of the playing fields, and to build a new single-storey pavilion on the east side. Whist the new pavilion will not be substantially larger than the old pavilion, it will be a more attractive building and laid out inside to provide changing rooms for boys and girls. The new pavilion will be between the two pitches.
  3. To make one of the new pitches an all-weather surface, and the other a grass surface. This is to weather-proof the sports programme and have a surface that can be used by teams in rotation and an all-weather pitch that is usable in harsh weather conditions without the concern of training or matches having to be cancelled.
  4. The all-weather pitch to have six artificial lighting fixtures on 18m poles and 1.2m-high fences. The lights will not have any spillage onto the path or road and will enable the facility to be used by local community sport clubs in the winter evenings
  5. A tree planting programme. The existing trees were planted in the 1950’s onwards without present-day consideration for species, wildlife or durability. We will be removing eight lower-value trees to make room for the all-weather pitch, and planting 74 new trees in the square – a ratio of 9.25 trees for each one removed.  Regardless of other development, Kenilworth Square requires a long-term tree & hedge planting programme.  Of the 188 trees & two hedges in the sports grounds, 108 (and the two hedges) have a life expectancy of only 6+ years, 77 16+ years, and 3 have a high quality & value with a life expectancy of 40+ years.

Existing 3 Pitches

OVERVIEW OF PROPOSED PROJECT DESCRIPTION – PROPOSED DEVELOPMENT

Pitch A – 4G Surface Pitch

  • Pitch A: 100m x 70m with artificial 4G surface for year-round play, reconfigured from two pitches to one full-size pitch.
  • Ancillary features include six artificial lighting fixtures on 18m poles, providing 500 LUX, 1.2m-high fences, and a minor impact on the Square due to setback and existing vegetation and proposed tree planting.

Pitch B- Natural Pitch

  • Pitch B: 100m x 70 natural pitch.
  • Pitch will be reseeded as part of the project.

Landscape and Planting Plans

  • Landscaping and Arborist Plans for improved boundary landscaping.
  • 8 No. Trees to be removed in Pitch B, to allow for the All-weather Pitch, Arborist plans show the replanting of 74 no, new native trees to mitigate the small number of trees that are hazardous and to be removed. For every one tree removed we are adding an additional 9.25 (please refer to Tree Planting Plan)
  • Some of the existing trees were planted in the 1950’s onwards without present-day consideration for species, wildlife or durability. The replacing of trees that are considered hazardous is an essential part of this development for the consideration of wildlife in the square and for the safety of the neighbouring properties
  • Download the Assessment of Trees Report
  • Download Tree Restraint Plan

Ancillary Works:

  • 4G all-weather pitch with lights.
  • Removal of the pavilion on the south side of the square and building a new A- Rated energy efficient pavilion on the east side of the square.
  • Car parking areas with 11 no. standard and 2 no. accessible parking spaces.
  • 2 no. Emergency car parking spaces at East and West entrances.
  • New vehicular gate entrance instead of a pedestrian gate to the east, with pedestrian gates at East, South, and West boundaries.

PITCH A and PITCH B layout.

Tree Planting Plan- Showing Location of 74 no. new trees (highlighted green area)

Questions & Answers

How is the school communicating its vision and plans for its sportsgrounds in Kenilworth?

By repeating the facts & the reasoning behind the project, as set out here:

The proposals are for:

  • One standard-sized all-weather 100 x 70 all-weather pitch and one 100 x 70 grass pitch, which together will take up marginally less of the Square than the present three smaller pitches.
  • To remove 8 trees, none of which are high quality or heritage, and to plant 74 new trees, all of which will be. For every one tree removed, we are replacing with an additional 9.25 new trees.
  • Removal of the old pavilion on the south side of the square and building a new pavilion on the east side of the square. The new pavilion will be single-storey, A- Rated energy efficient with a grass roof, solar panels, heat pump, and dressing rooms to accommodate both boys and girls.
  • The all-weather pitch to have six lights on long thin poles and be surrounded by a 1.2m-high fence. The lights will not have any spillage onto the path or road and will enable the facility to be used by local community sport clubs in the winter evenings.

The purpose is to create:

A facility that will lead to more youngsters playing more sports more of the time, with all the proven benefits of that.

A space presently used only by one school, will be available to community clubs for kids in many schools on the same not-for-profit basis as the front pitch in St Mary’s in Rathmines. This sharing is another response of the St Mary’s school community to the chronic shortage of sports pitches in the locality.

Greatly improved environmental management of Kenilworth Square, in the first instance by building carbon-neutral changing rooms and planting the sort of trees that will flourish for generations and add to the biodiversity of the locality.

What is planning permission needed for, and what is it not needed for?

For all building works, you establish what you need planning permission for, and what does not require it. If in doubt, and if behaving responsibly, you apply to the council for clarification. For example, you usually don’t need planning permission to build a conservatory or a garden shed, but you do for an extension more than 40 sq to your house.

We applied to Dublin City Council, by what is called a Section 5 application, to advise whether we needed planning permission to lay out an all-weather surface on the existing grass pitches and to combine two pitches into one.  Dublin City Council confirmed on 22 August that we do not require planning permission for these works. We expected that this would be so, as the rules are clear and have been applied in similar cases. We will apply for planning permission for the lights and for the changing rooms, and we will proceed with the tree planting and other sensible measures to improve the grounds in line with present standards of environmental excellence.

Has the school engaged with residents about the plans?

Back in May, we delivered information packs to residents which included a cover letter co-signed by the principals, a map of the square and details of the proposed changes, a phone number and email address of the planning consultant with an invitation to make contact, and a link to the website which contains the plans and which has been updated as needed. We also put the website, www.visionkenilworthsquare.ie, into circulation through sending it to all those whom we knew had an interest, with a request to pass it on to others. All contacts have been responded to. There are continuing efforts to speak directly to a group of people opposed to the proposals. As issues come up, the responses on the website are updated.

What is the scale of this development, as outlined in the plans published by the school?

Modest, and in line with the normal development of sports’ grounds to allow for all-weather usage with lights, including Mount Pleasant Square, Ranelagh and Grosvenor Square, Rathmines. We would like to reiterate a few keys points:

  • It remains a sports ground – no building for profit or sale.
  • Playing space will be reduced from three pitches to two, from 14,195m2 to 14,000 m2.
  • There will be no stands, no terraces.
  • The old pavilion on the north side of the square will be removed and new pavilion will be rebuilt on the east side of the sports grounds. This will be single storey. Like everything else in this proposal, it is underpinned by the principles of sustainable development, with a living grass roof and powered by solar panels and a heat pump.
  • With the old pavilion removed the area will become part of the second pitch, which will be grass.
  • Car parking will be limited to what is needed for disabled, emergency and staff access.

Is it a commercial proposition?

No. This is a non-profit making project. St Mary’s will pay to improve the facilities in Kenilworth. It will be funded by donors, not investors. When other sports clubs use the grounds, they will contribute to cover the extra costs of opening and maintenance. St Mary’s is a school, not a business. And in addition, there will be no cost to the taxpayer.

One donor put it like this. ‘If there is anyone who wants to invest on the basis that they will never recover their capital, and never turn a profit on the running of the facility, then they are welcome to do so!’

What is the plan for the trees?

We are planting 74 new trees in Kenilworth. All will be native trees or pollinators. We are proposing to remove 8 trees, none of which are high quality or heritage. For every one tree removed we are replacing with an additional 9.25 trees. In total there are 188 trees in the Square. None appear to date from the 19th century, unfortunately. On the contrary, most were planted in the 1950’s from whatever saplings could be sourced without regard to whether the trees were native or pollinators.

We commissioned an arborist to examine every tree in Kenilworth Square and report on what each one is, and how long it will last. A link to the report is here. The trees consist mainly of Monterey Cypress, Leyland Cypress, Pine, Sycamore, Beech, Lime, Poplar, Birch, Leyland Cypress, Lawson Cypress and Holly. 98 of the 188 trees are categorised as ‘low quality’. Another 77 are described as ‘moderate quality’. An additional ten are now at end- of-life. Only 3 of the trees in Kenilworth are Category A, ‘trees of high quality’. When finished, Kenilworth Square will have many more trees of high quality.

Will the pitch lights light the whole area? Will they help illuminate the darkness on the footpaths around Kenilworth Square on winter nights?

The lights question has been phrased in both of these ways. Modern pitch lighting is very targeted on the playing surface – on the St Mary’s front pitch in Rathmines, we had to install additional lights on the footpaths around the pitch, because even when the pitch lights are on, the paths were dark.

Does the new pavilion have a bar in it?

No. The new pavilion is designed to be used by boys and girls playing sport. It will have

changing rooms, showers, and storage for footballs etc.

What is the advantage to the students in the school of this development?

To play games on two full-sized pitches, rather than three smaller ones, and to have an-all weather pitch to protect against winter cancellations and wear-and-tear. And to have better changing rooms.

What is the advantage to the community of this development?

Local sports clubs – boys and girls, soccer, GAA, rugby, cricket – get access to a new pitch for training and games. Everyone involved in children’s sport in Dublin is only too aware of the chronic shortage of pitches and the regular cancellation of training and matches because of bad weather. We have received a very positive response from many in the locality and children’s sports clubs to the news that Kenilworth will get an all-weather facility.

What we are asking of the people who live around or near Kenilworth Square

To give the proposals a fair hearing.

To engage with us through emailing or calling the planning consultants we have appointed, so that we receive further suggestions on how to improve the plans and are given the opportunity to answer concerns.

What is the school’s track record?

The pitch in front of the school in Rathmines was developed in 2020. It had been used exclusively by St. Mary’s College Junior School until developed but is now used by Ranelagh Gaels GAA, Beechwood Football Club, St. Mary’s RFC, Templeogue Synge Street GAA, Belmont Football Club, Portobello GAA, Harold’s Cross Football Club and Terenure Rangers FC. The trees along the Rathmines Road were retained and additional trees planted along the Military Road. It is a showpiece of what can and should be done with sports pitches.

What happens next

We are taking on board what we are hearing back and will continue to update the website with changes and updates to the project.

Contact

0 + 7 = ?